Services / Service & Distribution

Everything downstream depends on this.

The service entrance and the distribution behind it decide what a building can run, what it can add later, and how it behaves on the worst day. ZVRGE installs, upgrades and replaces that equipment — including in facilities that cannot go dark.

What this covers

  • Service entrance
  • Switchboards & switchgear
  • Panelboards
  • Feeders & busway
  • Transformers
  • Metering
  • Service upgrades
  • Live changeovers
  • Grounding & bonding
  • Load studies

Sized for how the building actually runs

Nameplate totals describe a building nobody occupies. ZVRGE sizes services and feeders against measured load and realistic diversity, with headroom for what the facility is likely to add — because both errors are expensive, and undersizing is the one you find out about later.

Rows of electrical switchboards in an industrial hall

Upgrades in occupied buildings

Most service work is not new construction — it is a live building that needs more capacity or newer gear. That work runs on written switching sequences, agreed outage windows and temporary arrangements that hold the facility up while the permanent equipment goes in.

  • Written switching and changeover sequences agreed before the window
  • Temporary power sized to carry the loads that cannot stop
  • Cutovers rehearsed, with a way back at every hold point

Grounding and bonding, done as a system

Grounding is the part that is easy to pass and hard to do well. Ground rings, bonding networks and equipment grounding are installed to specification and tested, because it protects both people and the equipment that depends on a stable reference.

Documented, so the next person can work on it

One-lines that match the installation, panel schedules that match the panels, and torque and test records filed at turnover. The value shows up years later, when somebody has to trace a circuit under pressure.

High-voltage substation structures under open sky

A service upgrade is a planned outage with a written way back not a hope.

FAQ

Common questions

Usually, with planning. The normal approach is temporary power carrying critical loads while the permanent gear is installed, then a rehearsed cutover in an agreed window. Whether a full shutdown is avoidable depends on the existing arrangement — we tell you which case you are in before the work is priced.

Talk to us

Have a service & distribution project?

Tell us the scope, the site and the timing. Someone who does this work will come back to you — not a form letter.

or email info@zvrge.com

Facility down right now? Use the 24/7 emergency form instead — it goes straight to the response team.

24/7 EmergencyRequest Service