
Markets / EV Fleet Infrastructure
Fleet charging at depot scale
Electrifying a fleet is a power project before it is a vehicle project. ZVRGE builds depot charging infrastructure across Texas — the service capacity, distribution, charger installation and load-management wiring that turn a parking lot into a fueling facility.
What we deliver
- Depot charging construction
- DC fast charging installation
- Level 2 fleet charging
- Electrical service upgrades
- Switchgear & distribution
- Transformer installation
- Utility coordination
- Load management wiring
- Trenching, conduit & site raceway
- Metering & monitoring wiring
- Phased rollout construction
- Charging system service
Depot charging at scale
Charging one truck is an outlet; charging a fleet is megawatts on a schedule. ZVRGE builds depot charging as the power project it is — service, switchgear, distribution and charger installation sized for the full fleet plan, not just the pilot vehicles.

02
Service and capacity upgrades
Most depots were never fed for charging load, so the project usually starts at the service entrance. ZVRGE installs upgraded services, transformers and switchgear, and stages the cutover so fleet operations keep running while capacity grows underneath them.
03
Utility coordination
New charging load is a conversation with the utility, and it is on the critical path. ZVRGE supports that process from the construction side — load information, service requirements, site readiness and scheduling — so the transformer shows up when the chargers do.
04
Load management & controls wiring
A depot that manages its load charges more vehicles on less service capacity. ZVRGE installs the load-management, metering and communications wiring that lets charging systems share capacity intelligently — terminated, labeled and verified point to point.
- Load-management and charger communications wiring
- Metering and monitoring circuits
- Network infrastructure between chargers and head-end equipment
05
Site infrastructure
Fleet charging lives outdoors, in pavement. ZVRGE handles the trenching, duct banks, conduit, equipment pads and site raceway that put power across a yard — coordinated with paving and civil work so the site is opened once, not three times.
06
Built for the next phase
Fleets electrify in waves, and infrastructure should anticipate that. ZVRGE installs conduit, capacity and distribution provisions for future phases during the first mobilization — because concrete is cheap to size correctly and expensive to cut twice.
FAQ
Common questions
No. ZVRGE builds commercial and fleet charging infrastructure — depots, yards and workplace installations at scale — not single-home charger work.
Let's power what's next.
Electrifying a fleet or planning depot charging capacity?
24/7 Emergency Response


